top of page
Apiya Jahan Pompi
Architectural Engineering Technology
PROJECT 2
CONTEXTUAL FIT

PROGRAM
An addition to an existing order, "requires first that the ordering system of the prior or prototypical model be perceived and understood so that, through a series of finite changes and permutations, the original design concept can be clarified, strengthened, and built upon, rather than destroyed."

SMITH HOUSE
NARARTIVE

EXISTING HOUSE ANALYSIS

Analysis 1

Analysis 2

Analysis 3

Analysis 1
1/3
PRELIMINARY DESIGNS
STRUCTURE


SPACE

CIRCULATION

3D MASS
FINAL DESIGN

My Channel
Watch Now
















bottom of page